From the idea to the first swim strokes: How much time should I plan for?

From the planning of your pool system to the delivery of the pool, you can expect around six to eight weeks. Depending on the scope of the technology, approximately two weeks pass between the delivery of the pool and its completion. The construction site can already be prepared in the week before the pool is delivered, meaning the excavation pit is dug, the concrete slab is created, and, if necessary, the filter system is already placed. This gives you a very short construction time in the garden, because the actual production of your swimming pool takes place in the factory. 